A sound substrate decides how long a resin floor lasts, and this floor grinder is built to prepare it. It removes laitance and weak surface layers from concrete, strips worn epoxy and other coatings, and levels high spots and rough patches, leaving a clean base with the texture a primer needs to bond. Applying resin over a poorly prepared surface invites peeling, blistering and early failure, so grinding is where a good installation starts.
For renovation, it can take off failed or poorly bonded coatings, or grind a firmly bonded floor back to a suitable profile for recoating. Loose material is removed, and any remaining coating should be checked for adhesion and compatibility. With the right tooling, it also handles progressive smoothing and polishing, though a floor for resin coating should be finished to the specified profile, not polished smooth.
Productivity varies with concrete hardness, coating thickness and tooling. Dust extraction and safe operating procedures should be used throughout. After grinding, remove all dust, repair cracks and check moisture conditions before coating begins.
The grinder suits factories, warehouses, workshops, garages and commercial premises, anywhere contractors need to clear old finishes and prepare a well-bonded base for new epoxy flooring.
Share to

Most coating failures trace back to the substrate, not the resin. Peeling and blistering usually begin with laitance, loose material or old residue that was never properly removed. This floor grinder deals with the problem at the source. It strips weak surface layers from concrete, takes off worn epoxy and other coatings, and leaves a clean, sound base with the texture a primer needs to grip.
Coating Removal and Renovation
Renovation work starts with the old floor. The grinder removes tired, damaged or poorly bonded epoxy so the substrate underneath can be inspected and repaired. Where an existing coating is still firmly attached, it can instead be ground back to a suitable profile for recoating. Either way, loose material has to go, and whatever remains should be checked for adhesion and compatibility with the new system.
Leveling and Surface Profile
High spots, raised edges and rough patches make coating harder to apply and show through in the finished floor. Grinding knocks them down and evens the surface. Fitted with polishing tooling, the machine can also take a floor through progressive finishing stages. The tooling you choose sets the outcome: removal, grinding, smoothing or polishing. For resin work, though, the target is the specified surface profile. A floor polished too smooth will need re-profiling before it is coated.
Supporting Adhesion
Roughness matters here. Grinding widens the bonding area so the primer can key into the concrete. Afterwards, remove all dust and debris, repair cracks and damaged areas, and check moisture conditions. Grinding is one step in a full preparation process, not a substitute for it.
Operation and Productivity
The machine is built for straightforward operation, and the same unit covers coating removal, smoothing and texture creation. Output depends on concrete hardness, coating thickness, tooling and the finish required. Match the tooling to the job, use proper dust extraction, and follow safe operating procedures throughout.
Applications
Suited to concrete preparation and old epoxy renovation in factories, warehouses, workshops, garages and commercial premises. It fits any project where contractors need to clear existing finishes, correct the substrate and lay a base for a new resin flooring system.
 





High-transparent crystal epoxy resin R & D and production for 20 years.
Over 10 years experience for exporting.
Quality Control : same workers for material feeding and same person to supervise and record data for every batch ; Taking sample to test and mark the details for batch.
ROHS,REACH,CPSIA,BPA,TRA, EN71 ,FDA etc. SA8000 social responsibility system, IS09001 quality system.
We are good at providing solution service for each industry product within 3 days.

Fast delivery : Capacity production 1000 tons per month , 3~5 days delivery for batch order.
20 sets of automatic production equipment. 5 OEM production lines. Plant area 20000 square meters.



                             3 days delivery for R&D sample

Â