Huizhou Jincheng Composite Materials Co., Ltd.
+86 181 6574 7953
Weather-resistant topcoat|Moisture-tolerant primer|Elastic intermediate coat|Strong interlayer adhesion
Our polyaspartic balcony waterproofing system protects exposed concrete with three coats, each assigned a single job. The primer, a two-component, solvent-free polyurea-modified epoxy, cures at ambient temperature and bonds to properly prepared damp concrete, so residual moisture is less of an obstacle. Above it, an elastic polyurea mortar based on polyaspartic ester and aliphatic polyisocyanate keeps the waterproof layer continuous, absorbing minor substrate movement and resisting cracking within specified limits. The polyaspartic topcoat finishes the surface, standing up to sunlight, rain and compatible chemicals while holding its colour outdoors. Together they form a seamless floor rather than a stack of separate products.
The system suits residential balconies, apartment developments and commercial buildings, on both new slabs and refurbishment projects. Fewer seams across the main floor make cleaning easier. Moisture tolerance does not replace proper substrate checks, and the coating is no substitute for necessary repairs. Performance still depends on the details: substrate assessment, crack and joint treatment, drain outlets, wall junctions, thresholds, drainage falls, coating thickness and curing conditions all need attention. Where wet foot traffic is expected, select a suitable surface texture or slip-resistant aggregate. Applied correctly, the system gives balcony concrete durable, weather-resistant protection with a clean finish.
Share to

Balcony slabs take a beating: sun overhead, rain on the surface, and a concrete substrate that never quite stops moving. Our polyaspartic system answers with three coats, each doing one job. A moisture-tolerant primer bonds to the concrete. An elastic polyurea mortar carries the waterproofing. A polyaspartic topcoat faces the weather. The result is a seamless floor for residential balconies, apartment developments and commercial buildings alike.
Primer: Bonding to Damp Concrete
The base coat is a two-component, high-solids, solvent-free polyurea-modified epoxy. Its resin, functional additives, hydrophilic diluent and specially modified curing agent let it cure at ambient temperature and wet out the concrete thoroughly. Because it tolerates residual moisture, it suits balcony slabs that are rarely perfectly dry. On properly prepared damp concrete, it forms a dependable bond for everything above it.
Tolerance has limits, though. Standing water, contamination, weak concrete and unsuitable moisture conditions still need to be dealt with before application, following the product’s technical requirements.
Intermediate Coat: Flexibility Where Cracking Starts
Above the primer sits a two-component elastic polyurea mortar built on polyaspartic ester and aliphatic polyisocyanate. This is the body of the system and the layer that keeps the waterproof membrane continuous. It stretches enough to follow minor substrate movement and temperature swings, resists cracking within the system’s specified limits, and bonds firmly to the layers on either side. Resistance to weathering and discoloration adds to its durability.
It is not a repair material. Existing cracks, movement joints and structural defects must be assessed and detailed properly; the coating does not replace substrate repair or joint treatment.
Topcoat: The Weather-Facing Surface
The finish is a two-component polyaspartic topcoat, again based on polyaspartic ester and aliphatic polyisocyanate. It takes the sun, the rain and contact with chemicals within its specified resistance range. Colour holds up well outdoors, and compatible cleaning agents or incidental spills do little harm, which keeps routine maintenance simple. Where the balcony will be walked on in wet weather, choose a surface texture or slip-resistant aggregate to suit the project.
Designing the Whole System
No single coat does everything, and this system doesn’t pretend otherwise. It fits new concrete balconies and refurbishment work, subject to substrate condition and compatibility checks. With fewer seams across the main floor area, cleaning is easier.
Materials only go so far. Drain outlets, wall-to-floor junctions, thresholds and movement joints belong in the waterproofing design from the start, alongside correct drainage falls, specified coating thickness and suitable curing conditions. Get those right and the system delivers what it was built for: a durable, weather-resistant finish over protected concrete.




High-transparent crystal epoxy resin R & D and production for 20 years.
Over 10 years experience for exporting.
Quality Control : same workers for material feeding and same person to supervise and record data for every batch ; Taking sample to test and mark the details for batch.
ROHS,REACH,CPSIA,BPA,TRA, EN71 ,FDA etc. SA8000 social responsibility system, IS09001 quality system.
We are good at providing solution service for each industry product within 3 days.

Fast delivery : Capacity production 1000 tons per month , 3~5 days delivery for batch order.
20 sets of automatic production equipment. 5 OEM production lines. Plant area 20000 square meters.



                             3 days delivery for R&D sample

Â